17.7 C
London
Saturday, August 13, 2022

Intel denies Meteor Lake is delayed to 2024, says client chips will launch in 2023

Must read

- Advertisement -


Intel had an extremely tough quarter, unexpectedly losing half a billion dollars resulting from a PC buying hunch, and yesterday appeared like extra unhealthy information — a report from TrendForce about manufacturing delays sparked rumors that Intel’s subsequent huge flagship processor Meteor Lake could be delayed till 2024, which might put it as a lot as a 12 months delayed. (In a February investor assembly, Intel mentioned that Meteor Lake could be “powering on” this summer season earlier than transport in 2023.)

Nevertheless, Intel is flatly denying these rumors right this moment, with spokesperson Thomas Hannaford clarifying to The Verge that not solely are they unfaithful, however that Meteor Lake will truly ship, launch, and be accessible to shoppers in 2023.

- Advertisement -

Intel’s shopper processor roadmap, as of 2022 Investor Day
Picture: Intel

That’s a superb factor for Intel, as a result of Meteor Lake is among the firm’s most important developments in many years. Not solely is it the primary shopper processor on the corporate’s Intel 4 structure (previously often known as 7nm) and reportedly its first to make use of excessive ultraviolet lithography (EUV) in manufacturing, it’s additionally the primary main launch from Intel to make use of a chiplet design where processor components can be combined more like Legos. Intel had already begun shifting to hybrid chips with its twelfth Gen Alder Lake’s mix of performance and efficiency cores, just like a smartphone chip, however that’s not the identical factor.

The concept that Meteor Lake continues to be on observe gained’t be a lot of a shock to anybody who listened to Intel’s Q2 2022 earnings name. There, Intel CEO Pat Gelsinger straight-up advised traders that the corporate would ship Meteor Lake in 2023, saying that it was displaying “good well being in each our and our clients’ labs” and that it had already been “broadly sampled to clients.”

Delivering samples to clients isn’t the identical as being prepared for a client launch, after all — however now, Intel is clarifying that it’ll be prepared for shoppers in 2023 too.

The TrendForce report urged that Intel wouldn’t even start mass manufacturing of a key Meteor Lake part till the tip of 2023, and that “this incident has tremendously affected TSMC’s manufacturing growth plan.” TSMC wouldn’t touch upon Intel, however denied that its capability growth undertaking had been affected in a press release to China’s Economic Daily.

Throughout its Q2 earnings name, Intel mentioned it had already shipped 35 million items of its twelfth Gen Alder Lake processors. Raptor Lake, which can possible be often known as Intel thirteenth Gen Core, ought to be coming later this 12 months.



Source link

More articles

- Advertisement -

Latest article