10.7 C
London
Monday, June 17, 2024

Opening 2024 Isle of Man TT race day schedule delayed by highway visitors accident

Must read

- Advertisement -



The primary 2024 TT race day was already hit with a schedule change owing to Thursday night’s qualifying apply being cancelled resulting from a highway visitors accident.

This prompted the organisers to change Saturday’s schedule, including a two-lap Superbike/Superstock qualifying for 10:30am native time.

The opening race of the occasion, the primary four-lap Supersport contest, was resulting from get below means at 1:30pm native time, adopted by the primary three-lap Sidecar race at 4pm native time.

Nevertheless, the Clerk of the Course has introduced that Saturday’s schedule has been hit with a one-hour delay.

In response to a TT spokesperson, there was a highway visitors accident over the mountain which requires the sweepers to clear up particles.

- Advertisement -

A brand new schedule has been launched, with roads closing at 11am, earlier than the Superbike/Superstock qualifying will get going at 11:30am.

The Supersport race will now begin at 2:30pm, earlier than the Sidecars happen at 5pm. No alterations have been made to the lap counts for each races.

Racing will proceed on Sunday with the opening six-lap Superbike race of the occasion, which is schedule for two:40pm native time.

Reigning Senior TT winner Peter Hickman heads into Saturday’s race day because the rider to beat, after posting a lap of 134.638mph on Friday evening aboard his FHO Racing Superstock BMW.



Source link

More articles

- Advertisement -

Latest article