14 C
London
Tuesday, May 28, 2024

Sopot, the building after the Gulf of Art. The city about its plans for the development of the building

Must read

- Advertisement -


After a four-year battle, the city of Sopot regained the building in which Zatoka Sztuki had been operating for years. – Everything left of the previous tenant, as if someone was running away from here. There were abandoned food, clothes, pots – enumerated Magdalena Czarzyńska-Jachim, deputy mayor of Sopot, who presented the idea of ​​the local government for the future of the building.

At the beginning of the year, after four years of dispute with the lessee, Sopot regained the building that had housed the Zatoka Sztuki for years. On Wednesday, the deputy mayor of the city said that the tenant had failed to empty the building. The building located on the beach was – as Magdalena Czarzyńska-Jachim pointed out – in a dramatic condition. “It looked like someone was running away from here.” Everything was left inside, including food in cold stores. There were private things, clothes or pots left behind – she enumerated at a Wednesday press conference organized in front of the building.

The user of the facility – as Czarzyńska-Jachim said – left a damaged roof, which caused flooding of the interior. He also ignored his duties related to the maintenance of the facility.

– There were no annual inspections, there were no five-year inspections. There were no fire lights, no hydrants. There were many flooded, damaged rooms, she said.

- Advertisement -

She pointed out that the balconies in the former Zatoka Sztuki are in such a dramatic condition that they had to be shut down because they were in danger of collapsing.

– City services have done a titanic job to get to the point where we are now. Where we can think about the future of this place – she noted.

Three floors of new ideas

So what will happen in the place where the premises operated? Czarzyńska-Jachim emphasized that the city has developed a functional program – which includes a list of what will ultimately be located in the building at Mamuszki Street in Sopot.

– The plans were developed together with the Baltic Artistic Agency BART and the Youth Cultural Center – noted the vice-president.

The plans are as follows – catering functions are to be preserved on the ground floor. There will also be an exhibition hall.

– On the first floor there will be art studios and new technology studios. There will be a music and composition studio, a movement studio. In addition, there will be a photo studio and an art studio, where there will be classes in drawing, painting and textiles – the deputy mayor enumerated.

On the top floor there will be an extended conference room, which will also be a concert, exhibition and event hall.

READ ALSO: Trawling in Zatoka Sztuki. Is there any trace of Iwona Wieczorek?

– We want it to be a hall for 300, 350 people. It is to be equipped with good, modern technologies, which requires raising the roof and increasing safety conditions – added Magdalena Czarzyńska-Jachim.

She added that the city has selected a contractor to develop a functional program for the building.

– From the moment of signing the contract with the selected contractor, there will be three months for the functional and utility program to be created, on the basis of which we will announce a tender for the construction project – stressed Czarzyńska-Jachim.

The turbulent past of Zatoka Sztuki

The police secured the area of ​​the former Zatoka Sztuki (video from December 23)TVN24

The conflict between Sopot and the successive administrators, first of Zatoka Sztuki and later of Nowa Zatoka, began in 2015. The case was widely publicized when officials accused the administrator of i.a. breaking the curfew, organizing illegal artistic events or conducting activities inconsistent with the content of the contract.

Zatoka Sztuki became even louder thanks to media publications and the investigation into the case of Krystian W. (“Krystka”), who was accused of sexual crimes. Later, Marcin T., the former co-owner of the infamous premises, was also charged.

READ ALSO: “Teenager hunters”, “sale” of girls and a network of secrets in Sopot

In December 2019, Sopot took away a piece of the beach from Zatoka Sztuki, leased together with the building. In turn, in January of the same year, the city terminated the entire lease agreement, but the company did not hand over the building.

At the end of December 2022, the building became famous again. This time thanks to investigators from the National Prosecutor’s Office in Krakow, who combed the facility and the surrounding area in connection with the disappearance of Iwona Wieczorek. At that time, the beach was dug up, old sewage wells were discovered, and the interior of the building was searched.

Main photo source: TVN24



Source link

More articles

- Advertisement -

Latest article