14.5 C
London
Monday, September 27, 2021

Warsaw. Difficulties on the railroad due to a damaged catenary

Must read

- Advertisement -


On Sunday morning, trains running through the Warsaw railway junction are delayed or canceled. According to the PKP PLK company, the traction network was damaged between the Warszawa Wschodnia and Warszawa Zachodnia stations.

Difficulties in running concern long-distance trains, Szybka Kolej Miejska and Koleje Mazowieckie. As the PKP PLK company announced in the announcement, the traction network was damaged on the section Warszawa Wschodnia – Warszawa Zachodnia. “Train traffic on track no. 3 and selected trains routed through Warsaw Central. There may be train delays of around 30 minutes” – reads the company’s announcement.

The Public Transport Authority in Warsaw also warns about the difficulties. “On the section Warszawa Wschodnia – Warszawa Zachodnia, at the stations Warszawa Stadion, Warszawa Powiśle, Warszawa Śródmieście, Warszawa Ochota, trains run on the wrong track” – informs ZTM.

Difficulties on the railroad due to a damaged overhead lineŁukasz Wieczorek / TVN24

Honoring tickets

- Advertisement -

Due to traffic difficulties – from 7.15 am, KM tickets were accepted in SKM, buses, trams and metro trains on the M2 line.

On SKM trains, tickets are honored on S1 trains: on section Pruszków – Otwock and S2: on the section Warsaw Chopin Airport – Sulejówek Miłosna.

On trams on the lines: 7 on episode Dw. Wschodni (Kijowska) – Battle of Warsaw 1920, 9 on episode Washington Roundabout – Bitwy Warszawskiej 1920, 22 on episode Lubelska – Daszyńskiego roundabout, 24 on episode Washington roundabout – Daszyńskiego roundabout, 25 on episode Kijowska – Bitwy Warszawskiej 1920 r.

On buses on the lines: 127 on episode de Gaulle roundabout – West Railway Station, 157 on episode Washington roundabout – West Railway Station, 521 on episode Washington roundabout – Bitwy Warszawskiej 1920

In the subway on the line M2 on the section: National Stadium – Rondo Daszyńskiego.

We also informed about the planned one renovation of the tracks between the Eastern Railway Station and the Warszawa Wawer station:

PKP PLK announces the renovation of the tracks between the Eastern Railway Station and the Warszawa Wawer stationTomasz Zieliński / tvnwarszawa.pl

Main photo source: Łukasz Wieczorek / TVN24



Source link

More articles

- Advertisement -

Latest article