10.4 C
London
Friday, May 24, 2024

Warsaw. Thousands of lighting poles to be replaced

Must read

- Advertisement -


Warsaw’s road builders have planned the modernization of a thousand lighting poles for this year alone. A large part of the work is already underway, and all will be completed by November inclusive, they announce.

The Municipal Roads Authority ensures that lamp posts are regularly replaced “to ensure the safety and efficiency of street lighting”. Old-fashioned concrete poles are usually replaced with modern installations. They are more durable, thus safe for pedestrians and drivers.

Greater strength of the new poles

The new poles are slender metal constructions in graphite color, referring to the new luminaires SAVA lighting fixtureswhich have been assembled on a large scale since last year. As a rule, their color and shape is consulted with the Warsaw Office of Architecture and Spatial Planning.

- Advertisement -

READ: Road builders want to create a remote lighthouse control system.

“The new metal structures not only enrich the aesthetics, but are also characterized by greater strength, which translates into durability and reliability. Our goal is not only to provide adequate lighting, but also to create a pleasant atmosphere on the streets of Warsaw” – road workers provide in a communication on this subject .

600 have already been replaced

The Municipal Roads Authority has planned to replace almost 1,000 poles, of which about 600 have already been replaced. He stipulates that these are not all works of this type in Warsaw. Even more poles have a chance to be replaced during possible redevelopments – e.g. Jana Kazimierza Street in Wola.

Tramwaje Warszawskie and the Capital City Expansion Board also carry out large-scale replacement of poles in their investments. Works of a smaller scope, including on the streets subordinated to ZDM, they are also occasionally run by private investors in consultation with the city. On smaller streets (municipal roads), in turn, district offices that manage them can invest.

Read also: Lower prices in tenders, you can build more. Plans of road builders for 2023

The main street of Odolan awaits a metamorphosis. Five companies took part in the tenderJana Kazimierza Street in Odolany will be rebuilt along its entire length. In addition to repairing the riddled roadway, it is planned to build bicycle paths, sidewalks and asylums for pedestrians. Five potential contractors applied for the tender. The offers of companies range from PLN 34.6 to 42.2 million. The lowest offer is over a million less than the cost estimate.ZDM

Main photo source: ZDM



Source link

More articles

- Advertisement -

Latest article